Predictive maintenance means fixing equipment shortly before it fails — not on a fixed calendar, and not after it trips. Most plants already have much of the data needed. The trick is to start small and prove value quickly.
- Pick critical assets
- Check the data
- Watch condition
- Add models
- Act & measure
1. Pick the critical assets
Rank equipment by what a failure costs: lost production, safety risk, repair cost. Start with five to ten assets where a trip really hurts — often pumps, compressors, fans and fired heaters.
2. Check the data you already have
Look at historian tags (flow, pressure, temperature, current), vibration readings and maintenance history in your CMMS. Recording failures in a consistent way — for example following ISO 14224 for reliability and maintenance data — makes later analysis far easier.
3. Start with condition monitoring
Before any machine learning, set normal operating bands and simple trend alerts. This alone catches many developing problems and builds trust with operators and maintenance teams.
4. Add models where they pay off
Anomaly detection and remaining-useful-life estimates help on assets with good data and repeat failure modes. Keep the models explainable: a technician should see why the alert fired.
5. Connect warnings to work — and measure
An alert is only useful if it becomes a planned job. Link warnings to work orders, then track what matters: trips avoided, planned versus unplanned work, and time between failures.
Tip: run a 12-week pilot on one unit. It is long enough to see real events and short enough to keep momentum.
Want to try it on your plant?
See early warnings in action in our live demo, or ask us for a pilot study.